1 2 3 4 5 6

Project Strengths

The key design factor from the Etymol technology will lead us to promising results in the following performance indicators:


  • Installed power capacity versus investment;
  • Profits per produced mega watt;
  • Lower operations and maintenance (M&O) costs;
  • Capacity factor (availability of energy at any moment); and
  • Climate change mitigation and minimum environmental impact.